| |
| Home » Products » Valor » vManage |
| |
| MONITORING & TRACEABILITY EXPERT |
| |
vManage is the Best-in-breed solution for exact traceability, production monitoring & material management.
MES – All Pick & Placement Machines Monitoring, Manual Work Station, Box Build, MSD, Traceability which
reduce your defect rates & improve your production yield. |
 |
| |
| VERIFICATION & MAINTENANCE |
| - |
Each & every Pickup was monitored & updated to Database. |
| - |
Feeder maintenance was indicated to Operator when the cycle
exceed its limit. |
| - |
Screen Printer Materials like solder paste, glue, solvent & tools like
stencil, squeegees, back-up plates etc. |
| - |
Value and tolerances can be specified per part number with various
LCR Meters (Agilent, Fluke) & Body Marking can be connected
directly to vManage and test is controlled. |
| |
| INVENTORY MANAGEMENT |
| - |
ach Pickup was updated to Database & updated for Stock control. |
| - |
Low Level warning to alert Operator to splice on right time. |
| |
| TRACEABILITY |
| - |
Trace data for each individual PCB includes all
data, include reference designator for each
component (Trace reports don't need any BOM
or program information) |
| - |
Tracing the bare-board information (vendor, lot
code), materials (solder paste, glue, solvent) & Tracing tools (feeders, stencils, squeegees,
back-up plates etc.) |
| |
| ADVANTAGES |
| - |
vManage provides the most reliable Feeder
Setup Verification in the industry. |
| - |
vManage provides the closed integration to any
machine. |
| - |
Fast Pickup error indication to avoid too many
component wastage. |
| - |
One concept supports Hand Assembly, Box Build and Repair
Station. |
| - |
Poor Line Performance, Line Stoppage due shortage of
material can be avoided using vManage. |
| - |
Optimized preparation of material for manufacturing floor. |
| - |
Full proof set-up and splicing verification on SMT machines. |
| - |
Component blocking and AVL control. |
| - |
Stops machine/operator if incorrect material is loaded. |
| - |
Indication of all manufacturing bottlenecks with ability to
drill down for further analysis. |
| - |
Monitoring of material consumption and scrap rates. |
| - |
Alerting to operators about materials that need
replenishment or when splicing is required. |
| - |
Prioritization of needs and guidance of stock room material
handlers to the work cells that require replenishment. |
| |
| LINE MONITORING |
| - |
Feeder, Machine Performance can be monitored. |
| - |
Poor Line performance can be monitored using Graphical Interface. |
| |
 |
| |